DAEDF Business Incubator 2017
- Shops and Offices for Entrepreneurs
- Revisited and Resized from 2015
- Annotations, Framing and Walls
- Reflected Ceiling Plan, Furr Down Details, Coordinating HVAC
- Aluminum Door Details
Okeene Public Schools 2016
- Ag Building Rebuild
- Coordinating Survey and Corroborating with Field Survey
- Coordinate with Abutting Existing Canopy
- Equipment Research and Layout
- Field Notes, Dimensions
- Construction Documents
Timberlake Schools 2016
- Master Plan for Future Sport Complex
- Provide Multiple Layout Drawings for Football, Track, Baseball, and Event Center
Woodland Gardens 2016
- Assisted Living Center in Hobart
- Survey Coordination, Parking and Site
- Millwork Layout, Room Layout
- Construction Documents and Layout
DR2 2015
- Specialised Recycling
- Public Face Addition and Customisation of Existing Metal Building Shop
- Parking, Documents, Public Restrooms, Roof/Parapet Detailing, Interior Elevations
Glencoe Public Schools 2015
- Public Event Center, Basketball Gym and Storm Shelter
- All Aspects of Construction Docs except Elevations and Site
- 3D Print Model (Ultimaker, Cura Software, SketchUp)
DAEDF Business Incubator 2015
- Shops and Offices for Budding Entrepreneurs
- Tabled by City
- Field Research of Precedents (Visiting Others in State)
- Modeling Survey, Site Design, Parking, Street and Traffic Design
- Construction Documents
- 3D Print Model (Ultimaker, Cura Software, SketchUp)
Timberlake Public Schools 2014
- Physical Education Facility and Storm Shelters, Helena
- Field Notes, Dimensions
- Plan, Elevation, and Section Drawing and Annotation
Wewoka Public Schools 2014
- Softball Field House
- Site Plan (Topo, Existing Conditions etc.)
- Floor Plan (Annotations, Callouts, Wall Types, Details, Dims)
- Reflected Ceiling and Roof Plans
- Elevations and Sections (Annotations, Callouts, Dimensions)
- Wall Sections and Details, Other Section Details
- Interior Elevations and Millwork Details
- Door Elevations and Details
Pawhuska Public Schools 2013
- Weight Room and Section 9 Locker Room
- Worked on All Aspects from Plans to Elevations to Wall Sections to Door Details
Reydon Public Schools 2013
- Bus Barn
- Drawings Start to Finish